Master Programme Coordinator Average Salary in Brazil 2024

How much money does a person working as Master Programme Coordinator make in Brazil?


Average Monthly Salary
8,790 BRL
( 105,000 BRL yearly)

LOW
4,040
BRL
AVERAGE
8,790
BRL
HIGH
14,000
BRL
All salary figures displayed here are per month except when noted otherwise.
All salary and compensation figures displayed here are gross salary figures, that is the salary before tax deductions. Because taxes may differ across sectors and locations, it is difficult to accurately calculate the net salary after tax for every career.

A person working as Master Programme Coordinator in Brazil typically earns around 8,790 BRL. Salaries range from 4,040 BRL (lowest) to 14,000 BRL (highest).


Salary Variance

This is the average salary including housing, transport, and other benefits. Master Programme Coordinator salaries in Brazil vary drastically based on experience, skills, gender, or location. Below you will find a detailed breakdown based on many different criteria.



Master Programme Coordinator Pay Scale and Salaries in Brazil

Median and salary distribution Brazil Master Programme Coordinator monthly
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/median-and-salary-distribution-monthly-brazil-master-programme-coordinator.jpg

Salary Structure and Pay Scale Comparison

5% of people earn
8,340 BRL or more
10% of people earn
7,300 to 8,340 BRL
20% of people earn
5,030 BRL or less
65% of people earn
5,030 to 7,300 BRL
Minimum Salary
4,040 BRL
Median
8,400 BRL
Maximum
14,000 BRL




Median Salary, maximum and minimum salary, minimum wage, starting salary, and the salary range

All salary figures displayed here are per month except when noted otherwise.
  • Salary Range, Minimum Wage, and Starting Salary

    Salaries for the position Master Programme Coordinator in Brazil range from 4,040 BRL (starting salary) to 14,000 BRL (maximum salary). It should be noted that the given figure is not the legally mandated minimum wage; rather, it represents the lowest figure reported in a salary survey that included thousands of participants and professionals from all regions of the country.

  • Median Salary

    With a median salary of 8,400 BRL, half of the professionals who work as Master Programme Coordinator in Brazil earn less than this amount, and the other half earn more. The median salary denotes the middle value of salaries. Ideally, you would want to belong to the group earning more than the median salary, located on the right side of the salary distribution graph.

  • Percentiles and Salary Scale

    The median is closely associated with two other values known as the 25th and 75th percentiles. By examining the salary distribution chart, it can be determined that 25% of professionals employed as Master Programme Coordinator in Brazil earn less than 6,770 BRL, while 75% earn more. Similarly, the chart shows that 75% earn less than 9,680 BRL while 25% earn more.

  • Pay Scale Structure

    To provide a better understanding of expected salaries, we categorized the frequently occurring salaries into different ranges. This approach provides a more precise representation of salary distribution for the job title Master Programme Coordinator in Brazil compared to simply calculating the average. The majority of reported salaries, approximately 65%, fall within the range of 5,030 BRL to 7,300 BRL. About 20% of salaries are below the 5,030 BRL mark, while 10% fall within the range of 7,300 BRL to 8,340 BRL. Only 5% of individuals have salaries exceeding 8,340 BRL.

Salary Comparison by Years of Experience / Master Programme Coordinator / Brazil

How do experience and age affect pay?

0 - 2 Years
4,590 BRL
2 - 5 Years+34%
6,130 BRL
5 - 10 Years+48%
9,060 BRL
10 - 15 Years+22%
11,000 BRL
15 - 20 Years+9%
12,000 BRL
20+ Years+8%
13,000 BRL
Percentage increase and decrease are relative to the previous value
Salary comparison by years of experience monthly Brazil Master Programme Coordinator
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/salary-comparison-by-years-of-experience-monthly-brazil-master-programme-coordinator.jpg

The experience level is the most important factor in determining the salary. Naturally, the more years of experience the higher the wage. We broke down salaries by experience level for people working as Master Programme Coordinator and this is what we found.


All salary figures displayed here are per month except when noted otherwise.

Employees with less than two years of experience earn approximately 4,590 BRL.

While someone with an experience level between two and five years is expected to earn 6,130 BRL, 34% more than someone with less than two year's experience.

Moving forward, an experience level between five and ten years lands a salary of 9,060 BRL, 48% more than someone with two to five years of experience.

Additionally, professionals whose expertise span anywhere between ten and fifteen years get a salary equivalent to 11,000 BRL, 22% more than someone with five to ten years of experience.

If the experience level is between fifteen and twenty years, then the expected wage is 12,000 BRL, 9% more than someone with ten to fifteen years of experience.

Lastly, employees with more than twenty years of professional experience get a salary of 13,000 BRL, 8% more than people with fifteen to twenty years of experience.

On average, a person's salary doubles their starting salary by the time they cross the 10 years* experience mark.
* Based on the average change in salary over time. Salary variations differ from person to person.

Typical Salary Progress for Most Careers

Salary Comparison By Experience Level
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/images/salary-by-experience.jpg

Salary Comparison By Education / Master Programme Coordinator / Brazil

How do education levels affect salaries?

Displayed below is the average salary variance between different education levels of professionals working as Master Programme Coordinator.

High School
5,630 BRL
Certificate or Diploma+18%
6,620 BRL
Bachelor's Degree+45%
9,600 BRL
Master's Degree+31%
12,600 BRL
Percentage increase and decrease are relative to the previous value
Salary comparison by education level monthly Brazil Master Programme Coordinator
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/salary-comparison-by-education-level-monthly-brazil-master-programme-coordinator.jpg

We all know that higher education equals a bigger salary, but how much more money can a degree add to your income? We broke down salaries by education level for the position Master Programme Coordinator in order to make a comparison.


Level 1: High School

Employees at this education level have an average salary of 5,630 BRL.


Level 2: Certificate or Diploma

At this level, the average salary becomes 6,620 BRL, 18% more than the previous level.


Level 3: Bachelor's Degree

At this level, the average salary becomes 9,600 BRL, 45% more than the previous level.


Level 4: Master's Degree

At this level, the average salary becomes 12,600 BRL, 31% more than the previous level.



Is a Master's degree or an MBA worth it? Should you pursue higher education?

A Master's degree program or any post-graduate program in Brazil costs anywhere from 43,000 BRL to 129,000 BRL and lasts approximately two years. That is quite an investment.

You can't really expect any salary increases during the study period, assuming you already have a job. In most cases, a salary review is conducted once education is completed and the degree has been attained.

Many people pursue higher education as a tactic to switch to a higher-paying job. The numbers seem to support the theory. The average increase in compensation while changing jobs is approximately 10% more than the customary salary increment.

If you can afford the costs of higher education, the return on investment is definitely worth it. You should be able to recover the costs in roughly a year or so.


Typical Salary Difference by Education for Most Careers

Salary Comparison By Education Level
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/images/salary-comparison-by-education.jpg


Salary and Compensation Comparison By Gender / Master Programme Coordinator / Brazil

Salary comparison by gender Brazil Master Programme Coordinator monthly
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/salary-comparison-by-gender-monthly-brazil-master-programme-coordinator.jpg

Though gender should not have an effect on pay, in reality, it does. So who gets paid more: men or women? For the people who work as Master Programme Coordinator in Brazil, the average difference between the salary of male and female employees is 16%.

Male
9,430 BRL
Female-14%
8,150 BRL
Percentage increase and decrease are relative to the previous value

Salary Comparison By Gender in Brazil for all Careers

Salary comparison by gender monthly Brazil
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/salary-comparison-by-gender-monthly-brazil.jpg


Average Annual Salary Increment Percentage / Master Programme Coordinator / Brazil

How much are annual salary increments in Brazil for individuals working as Master Programme Coordinator? How often do employees get salary raises?

Individuals working as Master Programme Coordinator in Brazil are likely to observe a salary increase of approximately 11% every 19 months. The national average annual increment for all professions combined is 9% granted to employees every 16 months.

Annual Salary Increment Rate Brazil Master Programme Coordinator
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/annual-salary-increment-rate-brazil-master-programme-coordinator.jpg


The figures provided here are averages of numbers. Those figures should be taken as general guidelines. Salary increments will vary from person to person and depend on many factors, but your performance and contribution to the success of the organization remain the most important factors in determining how much and how often you will be granted a raise.

Brazil / All Professions

Annual Salary Increment Rate Brazil
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/annual-salary-increment-rate-brazil.jpg

The term Annual Salary Increase usually refers to the increase in 12 calendar month period, but because it is rare that people get their salaries reviewed exactly on the one-year mark, it is more meaningful to know the frequency and the rate at the time of the increase.

How to calculate the salary increment percentage?

The annual salary Increase in a calendar year (12 months) can be easily calculated as follows: Annual Salary Increase = Increase Rate x 12 / Increase Frequency

The average salary increase in one year (12 months) in Brazil is 7%.

Worldwide Salary Raises: All Countries and All Jobs

World Average Annual Salary Increment
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/images/salary-increment-world.jpg

Salary Packages and Schemes

Not all compensation increases are reflected directly in the salary. Some companies offer upgraded packages to their staff instead of cash money. The figures displayed here account only for direct increments to the base salary.



Bonus and Incentive Rates / Master Programme Coordinator / Brazil

How much and how often are bonuses being awarded?Annual Salary Bonus Rate Brazil Master Programme Coordinator
Share This Chart
        Get Chart Linkhttp://www.salaryexplorer.com/charts/brazil/administration-reception-secretarial/master-programme-coordinator/annual-salary-bonus-rate-brazil-master-programme-coordinator.jpg

66% of surveyed staff reported that they haven't received any bonuses or incentives in the previous year while 34% said that they received at least one form of monetary bonus.

Those who got bonuses reported rates ranging from 0% to 4% of their annual salary.

Received Bonus
34%
No Bonus
66%

Types of Bonuses Considered

Individual Performance-Based Bonuses

The most standard form of bonus, where the employee is awarded based on their exceptional performance.

Company Performance Bonuses

Occasionally, some companies like to celebrate excess earnings and profits with their staff collectively in the form of bonuses that are granted to everyone. The amount of the bonus will probably be different from person to person depending on their role within the organization.

Goal-Based Bonuses

Granted upon achieving an important goal or milestone.

Holiday / End of Year Bonuses

These types of bonuses are given without a reason and usually resemble an appreciation token.

Bonuses Are Not Commissions!

People tend to confuse bonuses with commissions. A commission is a prefixed rate at which someone gets paid for items sold or deals completed while a bonus is in most cases arbitrary and unplanned.


What makes a position worthy of good bonuses and a high salary?

The main two types of jobs

Revenue GeneratorsSupporting Cast

Employees that are directly involved in generating revenue or profit for the organization. Their field of expertise usually matches the type of business.

Employees that support and facilitate the work of revenue generators. Their expertise is usually different from that of the core business operations.

Example:
A graphics designer working for a graphics designing company.

Example:
A graphic designer in the marketing department of a hospital.


Revenue generators usually get more and higher bonuses, higher salaries, and more frequent salary increments. The reason is quite simple: it is easier to quantify your value to the company in monetary terms when you participate in revenue generation.

Try to work for companies where your skills can generate revenue. We can't all generate revenue and that's perfectly fine.

Bonus Comparison by Seniority Level

Top management personnel and senior employees naturally exhibit higher bonus rates and frequencies than juniors. This is very predictable due to the inherent responsibilities of being higher in the hierarchy. People in top positions can easily get double or triple bonus rates than employees down the pyramid.

Average Hourly Wage / Master Programme Coordinator / Brazil


51 BRL per hour

The average hourly wage (pay per hour) for individuals working as Master Programme Coordinator in Brazil is 51 BRL.This is the rate they get paid for every worked hour.


Hourly Wage = Annual Salary / ( 52 x 5 x 8 )

About The Hourly Pay Rate

The hourly wage is the salary paid in one worked hour. Usually, jobs are classified into two categories: salaried jobs and hourly jobs. Salaried jobs pay a fixed amount regardless of the hours worked. Hourly jobs pay per worked hour. To convert salary into hourly wage the above formula is used (assuming 5 working days in a week and 8 working hours per day which is the standard for most jobs). The hourly wage calculation may differ slightly depending on the worked hours per week and the annual vacation allowance. The figures mentioned above are good approximations and are considered to be the standard. One major difference between salaried employees and hourly paid employees is overtime eligibility. Salaried employees are usually exempt from overtime as opposed to hourly paid staff.

What is the minimum hourly rate of pay?

The minimum pay rate per hour for people working as Master Programme Coordinator in Brazil is 23 BRL. This is the minimum as per the gathered data in the salary survey not the minimum hourly rate mandated by law.

Salary comparison with similar jobs

Job TitleAverage Salary
Administration / Reception / Secretarial-100%
Accreditation Specialist9,780 BRL+11%
Admin Clerk3,050 BRL-65%
Admin Executive4,630 BRL-47%
Administrative Aide3,360 BRL-62%
Administrative Analyst6,500 BRL-26%
Administrative Assistant4,730 BRL-46%
Administrative Associate4,580 BRL-48%
Administrative Coordinator4,380 BRL-50%
Administrative Manager6,680 BRL-24%
Administrative Officer4,550 BRL-48%
Administrative Receptionist4,330 BRL-51%
Administrative Secretary3,780 BRL-57%
Administrative Specialist4,160 BRL-53%
Administrative Support3,980 BRL-55%
Administrative Technician3,490 BRL-60%
Board Secretary4,180 BRL-52%
Branch Office Administrator6,860 BRL-22%
Business Administrator6,830 BRL-22%
Business Office Manager11,200 BRL+27%
Central Office Operator4,160 BRL-53%
Clerical Assistant2,760 BRL-69%
Clerk2,990 BRL-66%
Commercial Administrator6,030 BRL-31%
Commissions Processor5,420 BRL-38%
Conveyancing Secretary3,780 BRL-57%
Corporate Receptionist4,240 BRL-52%
Creditors Clerk4,230 BRL-52%
Data Entry Clerk2,990 BRL-66%
Data Entry Specialist4,460 BRL-49%
Document Controller3,810 BRL-57%
Document Management Specialist5,300 BRL-40%
Executive Administrative Assistant5,140 BRL-42%
Executive Assistant4,690 BRL-47%
Executive Officer5,800 BRL-34%
Executive Personal Assistant5,760 BRL-34%
Executive Secretary4,870 BRL-45%
File Clerk3,080 BRL-65%
Front Desk Attendant4,080 BRL-54%
Front Desk Coordinator5,300 BRL-40%
Front Desk Manager6,760 BRL-23%
Front Desk Receptionist4,080 BRL-54%
Front Desk Shift Leader5,300 BRL-40%
Front Office Assistant4,060 BRL-54%
Front Office Executive5,200 BRL-41%
Group Services Manager11,600 BRL+32%
Head Receptionist4,970 BRL-43%
Inquiry and Admissions Clerk2,810 BRL-68%
Key Account Assistant5,070 BRL-42%
Keyboard and Data Entry Operator2,800 BRL-68%
Leasing Administrator5,620 BRL-36%
Legal Secretary4,410 BRL-50%
Librarian5,310 BRL-40%
Mail Processing Clerk2,600 BRL-70%
Mail Sorting Clerk2,570 BRL-71%
Mailroom Clerk2,680 BRL-70%
Mailroom Manager4,920 BRL-44%
Management Support Secretary4,420 BRL-50%
Master Programme Coordinator8,790 BRL+0%
Medical Receptionist4,540 BRL-48%
Meeting and Event Assistant5,140 BRL-42%
Meeting and Event Manager10,500 BRL+19%
Night Manager6,440 BRL-27%
Office Administrator6,830 BRL-22%
Office Assistant3,080 BRL-65%
Office Automation Clerk5,150 BRL-41%
Office Clerk3,330 BRL-62%
Office Coordinator4,330 BRL-51%
Office Manager7,770 BRL-12%
Office Services Coordinator5,970 BRL-32%
Office Supervisor5,310 BRL-40%
Operations Analyst8,920 BRL+2%
Operations Clerk5,070 BRL-42%
Operations Manager11,600 BRL+32%
Personal Assistant4,240 BRL-52%
Planning Assistant5,150 BRL-41%
Process Expert6,520 BRL-26%
Program Coordinator6,300 BRL-28%
Programme Assistant5,460 BRL-38%
Project Administrator7,440 BRL-15%
Project Coordinator9,260 BRL+5%
Query Administrator5,310 BRL-40%
Reception Team Lead5,480 BRL-38%
Receptionist4,240 BRL-52%
Records Officer3,640 BRL-59%
Registry Administrator4,460 BRL-49%
Registry and Filing Clerk3,050 BRL-65%
Rental Clerk2,990 BRL-66%
Schedule Officer2,990 BRL-66%
Scheduler3,120 BRL-64%
School Secretary4,240 BRL-52%
Secretary3,710 BRL-58%
Service Reception Head5,170 BRL-41%
Switchboard Operator3,750 BRL-57%
Technical Program Manager9,630 BRL+10%
Technical Project Manager10,300 BRL+17%
Typist3,330 BRL-62%
Unit Secretary3,940 BRL-55%
Wayleave Officer3,120 BRL-64%

Salary Comparison By City

CityAverage Salary
Brasilia9,480 BRL
Rio de Janeiro9,590 BRL
Sao Paulo9,840 BRL

Government vs Private Sector Salary Comparison

Where can you get paid more, working in a private company or the government? The difference between the public or government sector salaries and the private sector salaries in Brazil is 6% on average across all career fields.

Private Sector
8,360 BRL
Public Sector+6%
8,880 BRL
Percentage increase and decrease are relative to the previous value

Salary Statistics and Calculation Guide

What is considered to be a good and competitive salary for the job title Master Programme Coordinator in Brazil?

A good and competitive compensation would range anywhere between 8,400 BRL and 9,680 BRL. This is a very rough estimate. Experience and education play a very huge part in the final earnings.

Gross Salary (before tax) and Net Salary (after tax)

All salary and compensation figures displayed here are gross salary figures, that is the salary before tax deductions. Because taxes may differ across sectors and locations, it is difficult to accurately calculate the net salary after tax for every career.

Base / Basic Salary

The base salary for a careers like Master Programme Coordinator in Brazil ranges from 4,040 BRL to 6,770 BRL. The base salary depends on many factors including experience and education. It is not easy to provide a figure with very little information, so take this range with a grain of salt.


What is the difference between the median and the average salary?

Both are indicators. If your salary is higher than both the average and the median then you are doing very well. If your salary is lower than both, then many people earn more than you and there is plenty of room for improvement. If your wage is between the average and the median, then things can be a bit complicated. We wrote a guide to explain all about the different scenarios. How to compare your salary


Browse Salaries

Salary Increase Letters

Best Paying Jobs
Home BROWSE SALARIES ARTICLES BEST PAYING JOBS Salary Comparison Arabic Spanish

©Salary Explorer 2024